Roof Installation
The front trailer wall sheets and radius cap have been installed in this photo. The roof sheeting has been rolled down the top of the trailer and attaches to the roof bows with 3M VHB tape.
Once the roof sheeting has been firmly attached to the roof bows down the entire length of the trailer, the entire perimeter of the roof sheet will be riveted to the top extrusion.
|